Manufacturing industry

18.01.2019

Heavy helicopters to be assembled in Kazakhstan

The technology of assembling Mi-8AMT/Mi-171 heavy helicopters is being introduced in Kazakhstan for the first time. The contract for the organisation of a large-scale assembly was signed by Kazakhstan Engineering, Aircraft Repair Plant No. 405, and Russian Helicopters by the Rostec State Corporation.

The project was launched without attracting budget investments....

The technology of assembling Mi-8AMT/Mi-171 heavy helicopters is being introduced in Kazakhstan for the first time. The contract for the organisation of a large-scale assembly was signed by Kazakhstan Engineering, Aircraft Repair Plant No. 405, and Russian Helicopters by the Rostec State Corporation.

The project was launched without attracting budget investments....

18.01.2019

12.5 million square metres of residential space commissioned in Kazakhstan in 2018

The Ministry of Industry and Infrastructure Development summed up the results of housing construction in the republic and shared their plans for the future.

“In 2017, 11 million square metres of housing were commissioned, and we added another million square meters. In 2018, 12.5 million square metres were handed over, 113,740...

The Ministry of Industry and Infrastructure Development summed up the results of housing construction in the republic and shared their plans for the future.

“In 2017, 11 million square metres of housing were commissioned, and we added another million square meters. In 2018, 12.5 million square metres were handed over, 113,740...

17.01.2019

Industrial production in Kazakhstan increases by 4.1% in 2018

In mining and quarrying, production increased by 4.6%, in manufacturing - by 4%, in electricity, gas, steam and air conditioning - by 2.4%, the Statistics Committee announced.

Production in water supply, sewerage system, control over the collection and distribution of waste decreased by 1%. In January-December 2018, compared with January-December 2017,...

In mining and quarrying, production increased by 4.6%, in manufacturing - by 4%, in electricity, gas, steam and air conditioning - by 2.4%, the Statistics Committee announced.

Production in water supply, sewerage system, control over the collection and distribution of waste decreased by 1%. In January-December 2018, compared with January-December 2017,...

17.01.2019

Value of construction works in Kazakhstan in 2018 increases by 4.1%

The cash value of construction work (services) in Kazakhstan in 2018 amounted to 3.824 trillion tenge, which is 4.1% more than in 2017, the Statistics Committee reported.

Compared to 2017, the volume of construction and installation work increased by 1.4% to 3.224 trillion tenge. The volume of construction work on the...

The cash value of construction work (services) in Kazakhstan in 2018 amounted to 3.824 trillion tenge, which is 4.1% more than in 2017, the Statistics Committee reported.

Compared to 2017, the volume of construction and installation work increased by 1.4% to 3.224 trillion tenge. The volume of construction work on the...

14.01.2019

Creation of an engineering centre in the EAEU is being completed

The founding documents for the creation of the Eurasian Engineering Centre for Machine Tool Building were signed by the Armenian side in Yerevan with the participation of Technology and Science Dynamics (Armenia). Thus, in the countries of the Eurasian Economic Union (EAEU), the formation of a unified engineering structure, whose...

The founding documents for the creation of the Eurasian Engineering Centre for Machine Tool Building were signed by the Armenian side in Yerevan with the participation of Technology and Science Dynamics (Armenia). Thus, in the countries of the Eurasian Economic Union (EAEU), the formation of a unified engineering structure, whose...


News 1 - 5 of 318
First | Prev. | 1 2 3 4 5 | Next | Last